›› 2011, Vol. 24 ›› Issue (12): 30-.

• Articles • Previous Articles     Next Articles

Design of the Electric Power Load Management System Based on ARM9

 MA Xiao-Li, NAN Quan   

  1. (1.Department of Mechanical and Electrical Technology,Ningxia College of Vocational and Technical,Yinchuan 750002,China;
    2.New Products Department,Ningxia Longjiningguang Optical Instrument Co.,Ltd.,Yinchuan 750011,China)
  • Online:2011-12-15 Published:2011-12-16

Abstract:

This paper introduces the Electric Power Load Management Terminals system which adopt the operating systems of ARM9 and Linux and the design of the system.The Electric Power Load Management Terminals have strong and steady application software depending on the Linux system.By the technique criterion Q/GDW 374.1-2009,the tasks of the smart electric network management terminals are resolved into several threads of the executive tasks under application softwares,thus improving the capability and stability with which the system implements multi-tasks.

Key words: electric power load management;ARM9;GPRS;Linux

CLC Number: 

  • TM933.4