Research on optimal scheduling of hybrid production processes
J4
• Original Articles • Previous Articles Next Articles
NIU Hai-jun1;MA Jian-hui2;Miao Wei-ping3
Received:
Revised:
Online:
Published:
Abstract: We study the optimal scheduling method for hybrid production systems. Based on hierarchical modeling, we use the heuristics branch and bound algorithm to optimize scheduling. The objective is to minimize the production cost. According to the condition of production we have developed 5 rules, with two B&B algorithms structured. The cost includes not only the order and start time of production, but also the inventory cost.
Key words: hybrid processes system, optimal scheduling, B&B algorithm
CLC Number:
NIU Hai-jun1;MA Jian-hui2;Miao Wei-ping3.
0 / / Recommend
Add to citation manager EndNote|Reference Manager|ProCite|BibTeX|RefWorks
URL: https://journal.xidian.edu.cn/xdxb/EN/
https://journal.xidian.edu.cn/xdxb/EN/Y2004/V31/I1/9
Cited