[1] |
于智超, 刘帅, 杜克文. 基于神经网络的风力发电并网控制研究[J]. 电子科技, 2018, 31(8):89-95.
|
|
Yu Zhichao, Liu Shuai, Du Kewen. Study on control of wind power generation grid connection based on neural network[J]. Electronic Science and Technology, 2018, 31(8):89-95.
|
[2] |
冯俊杰, 范学强, 张志飞, 等. 一种改进的风电功率短期组合预测[J]. 电气时代, 2018(11):29-31.
|
|
Feng Junjie, Fan Xueqiang, Zhang Zhifei, et al. An improved short-term combined forecasting of wind power[J]. Electric Age, 2018(11):29-31.
|
[3] |
谢辉煌, 郑荣进, 黄晓生. 趋势外推法在连江县电力负荷预测中的应用[J]. 电气时代, 2017(6):78-80.
|
|
Xie Huihuang, Zheng Rongjin, Huang Xiaosheng. Application of trend extrapolation method in power load forecast in lianjiang county[J]. Electric Age, 2017(6):78-80.
|
[4] |
王斌. 基于时间序列ARIMA模型的电力负荷短期预测分析[J]. 石河子科技, 2019(3):43-47.
|
|
Wang Bin. Analysis of short-term power load forecast based on time series ARIMA model[J]. Shihezi Science and Technology, 2019(3):43-47.
|
[5] |
刘有飞, 汤锦慧, 刘娟, 等. 基于线性回归分析的度夏电网特性研究[J]. 江西电力, 2018, 42(2):2-4.
|
|
Liu Youfei, Tang Jinhui, Liu Juan, et al. Study on the characteristics of summer power grid based on linear regression analysis[J]. Jiangxi Electric Power, 2018, 42(2):2-4.
|
[6] |
戴晖, 李峰, 雷文宝, 等. 改进灰色理论预测模型在分布式配电网中长期负荷预测中的应用[J]. 自动化应用, 2019(7):92-94.
|
|
Dai Hui, Li Feng, Lei Wenbao, et al. Application of improved grey theory forecasting model in long-term load forecasting of distributed distribution network[J]. Automation Application, 2019(7):92-94.
|
[7] |
刘瞻. 人工神经网络方法在化学试验中的应用[J]. 电子科技, 2017, 30(7):69-75.
|
|
Liu Zhan. Artificial neural network method used in chemical experiments[J]. Electronic Science and Technology, 2017, 30(7):69-75.
|
[8] |
吴东剑, 张龙港, 朱大君, 等. 基于随机森林的风力发电预测[J]. 电子世界, 2018(22):20-22.
|
|
Wu Dongjian, Zhang Longgang, Zhu Dajun, et al. Wind power forecasting based on random forest[J]. Electronics World, 2018(22):20-22.
|
[9] |
樊国旗, 蔺红, 程林, 等. 基于K均值模式划分改进模糊聚类与BP神经网络的风力发电预测研究[J]. 智慧电力, 2019, 47(5):38-42.
|
|
Fan Guoqi, Lin Hong, Cheng Lin, et al. Wind power prediction based on K-means pattern classification improved fuzzy clustering and BP neural network[J]. Smart Power, 2019, 47(5):38-42.
|
[10] |
师洪涛, 杨静玲, 丁茂生, 等. 基于小波—BP神经网络的短期风电功率预测方法[J]. 电力系统自动化, 2011, 35(16):44-48.
|
|
Shi Hongtao, Yang Jingling, Ding Maosheng, et al. A short-term wind power prediction method based on wavelet decomposition and BP neural network[J]. Automation of Electric Power Systems, 2011, 35(16):44-48.
|
[11] |
王丹平, 陈之栩, 涂孟夫, 等. 考虑大规模风电接入的备用容量计算[J]. 电力系统自动化, 2012, 36(21):24-28.
|
|
Wang Danping, Chen Zhixu, Tu Mengfu, et al. Reserve capacity calculation considering large-scale wind power integration[J]. Automation of Electric Power Systems, 2012, 36(21):24-28.
|
[12] |
Khosravi A, Nahavandi S, Creighton D, et al. Uncertainty quantification for wind farm power generation [C].Brisbane:International Joint Conference on Neural Networks, 2012.
|
[13] |
Tewari S, Geyer C J, Mohan N. A statistical model for wind power forecast error and its application to the estimation of penalties in liberalized markets[J]. IEEE Transactions on Power Systems, 2011, 26(4):2031-2039.
doi: 10.1109/TPWRS.2011.2141159
|
[14] |
王铮, 王伟胜, 刘纯, 等. 基于风过程方法的风电功率预测结果不确定性估计[J]. 电网技术, 2013, 37(1):242-247.
|
|
Wang Zheng, Wang Weisheng, Liu Chun, et al. Uncertainty estimation of wind power prediction result based on wind process method[J]. Power System Technology, 2013, 37(1):242-247.
|
[15] |
刘晓楠, 周介圭, 贾宏杰, 等. 基于非参数核密度估计与数值天气预报的风速预测修正方法[J]. 电力自动化设备, 2017, 37(10):15-20.
|
|
Liu Xiaonan, Zhou Jiegui, Jia Hongjie, et al. Correction method of wind speed prediction based on non-parametric kernel density estimation and numerical weather prediction[J]. Electric Power Automation Equipment, 2017, 37(10):15-20.
|
[16] |
韩爽, 刘永前, 杨勇平, 等. 风电场超短期功率预测及不确定性分析[J]. 太阳能学报, 2011, 32(8):1251-1256.
|
|
Han Shuang, Liu Yongqian, Yang Yongping, et al. Ultra-shortterm wind power prediction and uncertainty assessment[J]. Journal of Solar Energy, 2011, 32(8):1251-1256.
|
[17] |
Jones L E. Strategies and decision support system for integrating variable energy resources in control centers for reliable grid operations[M]. Columbia:AREVA Federal Services LLC, 2012.
|
[18] |
周松林, 茆美琴, 苏建徽. 风电功率短期预测及非参数区间估计[J]. 中国电机工程学报, 2011, 31(25):10-16.
|
|
Zhou Songlin, Mao Meiqin, Su Jianhui. Short-term forecasting of wind power and non-parametric confidence interval estimation[J]. Proceedings of the CSEE, 2011, 31(25):10-16.
|
[19] |
王乐, 余志伟, 文福拴. 基于机会约束规划的最优旋转备用容量确定[J]. 电网技术, 2006, 30(20):14-19.
|
|
Wang Le, Yu Zhiwei, Wen Fushuan. A chance-constrained programming approach to determine requirement of optimal spinning reserve capacity[J]. Power System Technology, 2006, 30(20):14-19.
|
[20] |
Sexton R S, Dorsey R E. Reliable classification using neural networks: a genetic algorithm and backpropagation comparison[J]. Decision Support System, 2000, 30(1):11-22.
doi: 10.1016/S0167-9236(00)00086-5
|
[21] |
周英, 尹邦德, 任铃, 等. 基于BP神经网络的电网短期负荷预测模型研究[J]. 电测与仪表, 2011, 48(2):68-71.
|
|
Zhou Ying, Yin Bangde, Ren Ling, et al. Study of electricity short term load forecast based on BP neural network[J]. Electrical Measurement & Instrumentation, 2011, 48(2):68-71.
|
[22] |
Dindorf R, Wos P. Contour error of the 3-DoF hydraulic translational parallel manipulator[J]. Advanced Materials Research, 2014, 87(4):57-62.
|